/home/wp_vv8c52/alliance.us.com/content/themes/alliance/single-projects.php on line 10
">
Projects

Dry Dock Replacement

This project replaces a dry dock at Joint Base Peal Harbor-Hickman in Hawaii. Alliance provided cost engineering services, cost and scheduling risk analysis (CSRA), and construction scheduling services for a DB RFP dock replacement.