Capabilities

From first sketch to defensible budget.

Our business is data driven: we deliver solutions that provide value, drive growth, and mitigate risk. Three integrated service lines carry a requirement from planning through cost engineering to design.

Capabilities

Three departments. One accountable team.

Each service line stands on its own — and is stronger together. Planners, estimators, and engineers work side by side, so plans arrive budget-ready and designs hold to the number.

01 — Plan

Master Planning & Programming

Mission-aligned plans that turn requirements into an executable roadmap — from unit to installation to headquarters level.

  • Area & Installation Development Plans
  • Basic Facility Requirements
  • DD Form 1391 programming
  • UFC 2-100-01 planning criteria
  • Stakeholder charrettes
Explore planning

02 — Cost

Cost Engineering & Risk Management

Defensible, transparent estimates and risk analysis that withstand independent government review — from pre-design through bid.

  • Class 5–1 estimates (MCACES / MII, RSMeans)
  • Cost & schedule risk analysis (CSRA)
  • Monte Carlo & sensitivity modeling
  • Life cycle cost analyses
  • Change order estimates
Explore cost engineering

03 — Design

Design Services

A-E design services that include Architecture, Civil, and Fire Protection — resilient, compliant, and constructible.

  • Architecture (federal & medical facilities)
  • Site & civil engineering
  • Stormwater, utilities & transportation
  • Fire protection engineering
  • Fire detection, suppression & alarm systems
Explore design

The Alliance difference

From requirement to design that holds the budget.

Most firms hand a project off between planners, estimators and designers. We keep it under one roof — so nothing is lost in translation and every decision is priced as it’s made.

  1. i.

    Define

    Validate the requirement with commanders, facility managers and stakeholders.

    Facility programming · Basic Facility Requirements

  2. ii.

    Plan

    Shape the installation for today’s mission and tomorrow’s growth.

    Area & Installation Development Plans · DD Form 1391

  3. iii.

    Price & De-risk

    Quantify cost and uncertainty before funds are committed.

    Class 5–1 estimates · Cost & schedule risk analysis

  4. iv.

    Design & Deliver

    Design to requirements and carry budget through to bid documents.

    Bid phase · Construction administration

Cost engineers sit at the planning table from day one — so plans arrive budget-ready, 1391s survive review, and designs stay inside the number.